Installation

Installation Location
In order to realize the best data transmission, ensure the device is within the signal range of the LoRaWAN® gateway and keep it away from metal objects and obstacles.
Installation Steps

1. Ensure the circuit has been shut off and the old switch has been taken off.

2. Open the front panel of WS50x switch.



3. Connect corresponding wires to the WS50x switch.



4. Fix the WS50x switch to the switch box with mounting screws, then fix the front panel back to the device.